|
所在平台: Udemy |
课程主页: https://www.udemy.com/course/system-hazard-analysis-with-mil-std-882e/
课程评论:没有评论
Coursera课程《如何使用Mil-Std-882E进行系统危险分析》课程总结 本课程名为“如何使用Mil-Std-882E进行系统危险分析”,由Simon主讲,于2020年4月13日录制。课程旨在提供专业、实用且公正的安全培训资源。 本次课程的重点是“系统危险分析”,这是Mil-Std-882E系统安全标准中的任务205。课程内容将涵盖以下几个方面: * **目的 (Purpose)**: 课程将详细阐述系统危险分析的四个主要目的。 * 验证子系统合规性。 * 识别子系统接口之间的危险。 * 识别子系统中产生的故障并分析其如何影响整体系统。 * 识别集成系统设计中的危险。 与课程任务204(该任务主要关注独立子系统的分析)相比,任务205更侧重于子系统之间的交互以及其对整体系统的影响。 * **任务描述 (Task Description)**: 将用五个幻灯片详细介绍任务205的具体内容。 * **报告 (Reporting)**: 将用两个幻灯片说明相关的报告要求。 * **合同 (Contracting)**: 将用一个幻灯片介绍与此任务相关的合同方面内容,这部分与以往没有大的变化。 * **评论 (Commentary)**: 主讲人将在整个课程过程中穿插进行评论和补充说明,以强调关键信息和解释概念。 课程中会使用黄色高亮标示任务205与任务204之间的差异,并使用下划线强调需要特别关注和重视的内容。
IntroductionHello, everyone, and welcome to the Safety Artisan, where you will find professional, pragmatic, and impartial safety training resources and videos. I'm Simon, your host, and I'm recording this on the 13th of April 2020. And given the circumstances when I record this, I hope this finds you all well.System Hazard Analysis Task 205Let's get on to our topic for today, which is System Hazard Analysis. Now, system hazard analysis is, as you may know, is Task 205 in the Mil. Standard 882E system safety standard.Topics for this SessionIn this session, we will cover purpose, task description, reporting, contracting, and some commentary - although I'll be making commentary all the way through. Going to the back to the top, the yellow highlighting with this and with task 204, I'm using the yellow highlighting to indicate differences between 205 and 204 because they are superficially quite similar. And then I'm using underlining to emphasize those things that I want to really bring to your attention and emphasize. Within task 205, purpose. We've got four purposes for this one. Verify sub system compliance and recommend necessary actions - fourth one there. And then in the middle of the sandwich, we've got the identification of hazards, both between the subsystem interfaces and faults from the subsystem propagating upwards to the overall system and identifying hazards in the integrated system design. So, it's quite different emphasis to 204, which was really thinking about subsystems in isolation. We've got five slides of task description, a couple on reporting, one on contracting - nothing new there - and several commentaries.