|
所在平台: Udemy |
课程主页: https://www.udemy.com/course/project-engineering-cost-estimation-brownfield-process-plant/
课程评论:没有评论
课程名称:工程成本估算 - 老旧工业过程工厂 课程概述:在化工行业,从事过程工厂工程、采购和施工(EPC)的设计和工程公司常常需提交技术和商业提案,以提供工程服务,用于扩建或改造现有设施,或进行修改和升级,以满足更严格的废物排放规范。这类项目通常称为“老旧场地项目”,与从头开始实现新项目的“绿地项目”相对。本课程旨在为具有一定过程工厂工程和现场经验的化工或机械工程师提供指导,使其了解与化工厂各类设备相关的工作成果。在许多情况下,客户可能并不会提供详细的项目工作范围,而只是通过简短的邮件询问EPC公司报价和项目工作范围。当公司基于这些信息提交投标时,就称为“自我启动”投标,这意味着他们主动采取行动。例如,客户会告知希望对现有反应设施进行扩展或自动化,或对现有干燥系统进行扩展/更换,或者希望实现自动打包及输送系统与筒仓存储的结合。此外,客户可能还会要求提供预算成本估算的可行性报告,以便获得管理层对资金和实施的批准。当客户发出这样的请求时,工程公司必须自行准备工程投标,定义预期的工作范围、交付物清单以及项目执行的预计工时成本和时间。这一活动需要大量现有图纸、文档或其他信息作为输入,以真实地估算EPC成本。本课程为成本估算工程师提供了一条明确的路径和方法,以定义工作范围、估算工时成本,并可靠地提交投标。该课程对希望作为日程安排和成本估算工程师从事过程工厂EPC工作的化工或机械工程师特别有用。
In chemical industry, a design and engineering company engaged in EPC of process plants is often called upon to submit their technical & commercial proposal for providing engineering services in order to carry out expansion / revamp of an existing facility or carryout modifications / upgrading to meet the stricter norms for effluent emission. These type of projects are generally called brown field projects as opposed to green field projects wherein the new project is implemented starting from scratch in a new barren plant site.This course is intended for chemical or mechanical engineers who have a couple of years of exposure to process plant engineering and field experience in a process plant so that they are aware of what is meant by a deliverable pertaining to various plant and equipment in a chemical plant. In many instances customer may not have detailed scope of work for the brown field project and will just send a brief email enquiry to EPC company to quote their fees and scope of work for the project. When the company submits its bid for EPC on this basis it is called "SUO MOTO' bid implying that action is taken by them on their own.For example, customer will inform that they want expansion/automation of an existing Reaction facility or expansion / replacement of am existing drying system or automatic bagging and transfer system with silo storage etc. Also they may ask for feasibility report with budgetary cost estimation for the project in order to get management approval for funding and implementation.When such a request comes from a customer, the engineering company have to prepare the bid for engineering on their own defining the expected scope of work / list of deliverables to be submitted and the estimated man-hour cost and timeline for executing the project. This activity needs lot of input by way of existing drawings / documents or other information to realistically estimate the EPC cost.This course attempts to give a guided path and method to the cost estimation engineer to define the scope of work , estimate the man-hour cost and submit the bid in a reliable approach.. The course will be useful to chemical or mechanical engineers who wish to work as scheduling and cost estimation engineer executing EPC of process plants.