PMP Preparation Course EVM & CPM Earned Value/Critical path

所在平台: Udemy

课程主页: https://www.udemy.com/course/pmp-preparation-course-evm-cpm-earned-valuecritical-path/

课程评论:没有评论

第一个写评论        关注课程

课程简介

课程名称:PMP备考课程 EVM与CPM赚取价值/关键路径 课程概述:本课程旨在帮助工程师提升为调度员、规划员、项目控制者的能力,或获取PMP认证。课程通过手动解决赚取价值方法分析(EVM)和关键路径法(CPM)的练习,提供了实用的步骤讲解。实例来源于一家大型欧洲建筑公司的招聘程序,特别针对寻找能够掌握这两个项目管理基本概念的规划经理。 课程内容包括: 1. 关键路径法的描述及总浮动的计算。 2. 赚取价值法的计算,该部分涵盖项目的关键绩效指标(KPI),如成本绩效指数(CPI)、成本偏差(CV)、进度绩效指数(SPI)和进度偏差(SV),以及预算完工(EAC)的计算。 通过本课程,你将了解基准的意义、完成预算的含义、项目是否超前或滞后于计划、以及是否在节约成本。讲座风格友好、简单易懂,课程轻松愉快,确保学习者能轻松掌握概念。所有重要概念均通过单独的视频进行解说,方便你选择想要学习的主题。此外,课程还包含了针对PMP考试的数学概念讲解及样题分析,让你能够像专业项目经理一样管理项目。 总之,通过学习本课程,你将掌握项目管理的基本技能,为成为一名合格的项目管理专业人士打下坚实的基础。

课程评论(0条)

课程详情

If you are an engineer who wants to become a scheduler, planner, project controller or simply you want to get the PMP certification, this is a practical course where I explain step by step how to solve by hand the exercises regarding the Earned Value Method Analysis and the Critical Path Method.The examples are taken from a real assessment recruiting procedure belonging to a big European Construction Company who was looking for a planning manager able to master the use of these two fundmentals Project Management concepts: the Earned Value Method and the Critical Path Method.The first example regards the description of the Critical Path Method, with the calculation of the Total Float. The second exercise regards the Earned Value Method, with the calculation of the KPI's of the project (CPI, CV, SPI, SV) and the EAC.At the end of this course you will be able to understand what a baseline represents, what a budget at completion means, if your project is behind or ahead of schedule, if you are saving money or not.My lectures are delivered in a friendly, simple, and easy to understand manner.You will have fun learning the concepts because I have kept the lectures to be as light, easy, and painless to understand.All important concepts have been covered through individual videos so you can simply jump to the topic that you want to learn.You will get to learn all PMP Math concepts through separate videos with sample questions that explain the concepts in detail from the exam perspective.By learning all the essential concepts, you will learn to manage projects like a professional PM.

课程标签

0人关注该课程

主题相关的课程