课程名称:施工项目监控与控制 概述:本课程适用于一般项目及特别是施工项目。在项目的不同阶段,从开始到结束,监控和控制是成功的关键。施工项目往往是不按计划执行的,因此,遵循有效的监控与控制策略至关重要。本课程将介绍和实施项目监控与控制的常用实践,内容分为五个部分: 第一部分:讨论不同的项目监控与控制流程(例如:验证范围、控制进度、控制成本等)及其整合,重点介绍项目调度的复习(关键路径法和优先图)。 第二部分:介绍常用的百分比完成度测量方法,并实例讲解如何测量整个项目的百分比完成度。 第三部分:介绍“挣值分析”(EVA),这是用来监控和分析项目在时间和成本方面表现的综合时效成本方法。讨论EVA的概念、目标,以及用于定义项目表现的多个重要指标。 第四部分:更新项目进度是反映项目当前和未来时间表现的重要手段。本部分将讨论进行进度更新时所需的信息类型及收集方法,并通过实例展示如何进行进度更新。 第五部分:讨论项目加速作为控制工具的概念、用途及方法,尤其是“时间-成本权衡”分析方法,并在此部分中提出重要的实际考虑。 祝您好运!
Note: The course contents can be applicable to non-construction projectsProjects in general, and construction projects particularly, goes through different stages from their inception to their closeout. In the simplest terms, a typical project starts as a "concept" which develops with time going through different phases such as designing, bidding, procuring, executing, and closing. In the absence of applying a proper monitoring and control at each of these phases, one should not expect a successful project. WHY? Simply because construction projects are dynamic in nature. In construction, no project, almost, is executed as planned. For instance, changes are very likely to happen. Moreover, problems related to procurements, resource availability, productivity, financial acquisition, communications, quality, stakeholder engagements, etc. are common in construction project. Such factors can lead to delays in project completion and/or cost overruns.Thus, to avoid or minimize such pitfalls, it is of extreme importance to apply adequate periodical monitoring and control to your project. "Monitoring" is comparing the project's actual performance against its planned performance (i.e. baseline), while "Control" is taking preventive and corrective actions to bring the possibly deviated project back on track.Accordingly, in this course, we will discuss and implement the common practices that are applied to project monitoring and control. The course is divided into five sections that are briefly described as follows:Section (1): The different project monitoring and control processes (e.g. validate scope, control scope, control schedule, control cost, monitor communications, etc.) will be discussed along with their integration. In addition, a review of project scheduling (critical path method and precedence diagram) will be discussed with example as the project schedule is a crucial prerequisite for applying monitoring and control.Section (2): The different methods that are commonly used to measure the percentage completion of each "activity" in your project will be discussed with examples. This is followed by understanding and implementing how the percentage completion of the entire "project" can be measured.Section (3): Measuring the work progress (whether for each activity or the entire project as discussed in section 2) is an important input to apply what is known as "Earned Value Analysis" (EVA). EVA is an integrated time-cost approach that is used to monitor and analyze the project performance with respect to time and cost. Thus, in this section the main concept and objectives of EVA will be discussed. This is followed by understanding three important measures that are to be determined periodically and used to define the project performance. To define the project's current performance and expected future performance, different analysis tools will then be discussed with examples (i.e. variance analysis, performance analysis, trend analysis, forecasting analysis, and reserve analysis). Finally, important practical concerns and consideration with respect to the validity of EVA will be discussed.Section (4): Nothing can better represent your project's actual current and expected future time performance like updating your project schedule. Thus, in this section we will discuss the main types of information required and collected when preparing a report to apply schedule updating. This is followed by understanding how schedule updating is carried with applying different examples.Section (5): The concept, uses, and methods of project crashing (or project acceleration) as a control tool will be discussed. We will understand that project crashing is not necessarily used only for project control, but it can be carried also for other purposes. One of the common analysis methods of project crashing is the "Time-Cost Tradeoff", which will be also discussed with important practical considerations in this final section.Best wishes and good luck.